Monday, 28 September 2009

Threlkeld Village Hall gets Planning


Green Design Group is proud to announce that they have secured planning permission on behalf of Threlkeld Parish Council for the refurbishment and extension of Threlkeld village hall in Threlkeld Cumbria.


Although the front of the building has minor interventions , the rear has a new contemporary extension which looks out over the A66 to the Cumbria Fells. It is intended that the new café within the hall caters for users of the C2C cycle route and the existing hall users. The build costs will be around 850k with grants towards sustainable energy systems.

Our client gave us this quote:-

“Threlkeld Parish Council and Threlkeld Village Hall Management Committee are delighted that the scheme has received planning permission in essentially the form submitted. This is a major milestone in the project – the challenge now is to raise the extensive funding needed to make the plans a reality. A large team from the village worked closely with the architects, and the scheme reflects our detailed requirements exactly in an interesting design which merges the traditional with the modern. We are looking to create a Village Hall which serves the community for another 100 years”.

Tuesday, 28 April 2009

Moorclose Bungalows finished





Green Design Group, as part of a design and build contract with local contractor Stobbarts handed over Moorclose Croft Bungalows to Derwent and Solway Housing Association in March 2009.

Wednesday, 11 February 2009

Albion Square goes public


The News and Star has published the background and an image of the Albion Street gateway project.

Details can be found at

http://www.newsandstar.co.uk/news/1.511210

Friday, 30 January 2009

Bardywell Lane Whitehaven




Green Design would like to announce that the project at Bardywell lane Whitehaven has attained full planning permission.

The project for a private developer is situated in a prestige harbour location on Bardywell Lane which will benefit from spectacular views of the harbour and the coast line of Scotland.

The Development consists of a multi functional building with retail space on the ground floor and residential space above

Applegarth Nursing Home




The new extension to an existing Carlisle Nursing Home providing specialist facilities for am Acquired Brain Injury and Physical Disability unit has been completed. The 2.1 million pound building houses 20 Specialist bedrooms, each with en suite bathrooms are supported by common lounges and dining areas as well as therapy rooms for sensory perception, physiotherapy and hydrotherapy.

Thursday, 2 October 2008

Extension to existing private nursery





Funded with private equity and a grant from the local authority this project is designed to extend and rationalize the existing nursery layout and provide an additional 25 places for children between the ages of 0-7 years of age.

The alterations at ground floor level include a laundry, children’s WC’s, a new kitchen, platform lift and ambulant disabled access stair. The extension at first floor level consists of an office, staff room, staff toilet and two large rooms capable of accommodating 2.5-7 year old children with links to the protected external play areas on both levels.

laces for children between the ages of 0-7 years of age.

The alterations at ground floor level include a laundry, children’s WC’s, a new kitchen, platform lift and ambulant disabled access stair. The extension at first floor level consists of an office, staff room, staff toilet and two large rooms capable of accommodating 2.5-7 year old children with links to the protected external play areas on both levels.

Monday, 4 August 2008

Albion Square - GDG wins commission







Green Design Group was a member of the West Lake’s Renaissance Framework team that has successfully bid for the provision of a feasibility study for the regeneration of Albion Square in Whitehaven.

GDG, under the framework will provide local architectural knowledge, design input and 3D computer modeling for the project to re-develop this area providing much needed commercial / residential and public realm investment.

The project is ongoing and due to be complete in November 2008.